Temporary Stables - LH Woodhouse

L.H Woodhouse, show and event specialists, constructed temporary stables at Hickstead, this system was deployed for the 2012 London Olympic Games, and 2014 World Equestrian Games.

J & J Carter completed the design and manufacture of a modular curved roof structure, including the textile membrane, for the temporary stables.

The system is a combination of using existing frame structure stock with an existing modular stable block. The end result is a sustainable system which goes on to replace older timber systems used at Agricultural show and various Sporting Events.

Key Facts

Location: United Kingdom
Structures: Frame Supported
Industry: Sport
Roof Forms: Barrel Vault

Download PDF
Our Cookies

This site uses cookies to store information on your device. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used.

Read more about essential and non-essential cookies in our Privacy Policy