Tone Scaffolding | Gas Drilling Rig Covering
Tone Scaffolding has recently been challenged by one of their oil and gas clients to make this impressive structure, free-standing due to site constraints, which they performed using innovative techniques to create a bespoke design.
Tone Scaffolding required a PVC cover for noise containment for the gas drilling facility owned by Star Energy. J & J Carter created a PVC keder roofing system to cover the roof of the 37m high Layher scaffolding structure.
Key Facts
Location:
United Kingdom
Structures:
Frame Supported
Industry:
Industrial
Roof Forms:
Planar
Materials:
PVC/PES