NWH water operates in the north east and south east of England, providing water and sewage services to 2.7 million people.
They invested £11 million to upgrade Howden Sewage Treatment Works. As part of the upgrade, NWH wanted to aid better air dispersal and increase the capacity of existing odour control systems.
As a result, J & J Carter were called upon to manufacture a 16,500 m2 Tensile Membrane to cover the Sewage Treatment Works. This cover allowed the staff of Howden to regulate and control odour. Also the modular barrel vaulted design allows the site operators to open and close the tanks in order to test its contents.
Are you interested in more information or would like to arrange a consultation?
Give us a call, drop us an email, visit us or fill out an enquiry form below.
This site uses cookies to store information on your device. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used.
Read more about essential and non-essential cookies in our Privacy Policy